Yıldırım Teknik

Quality

Quality starts in the process, not at final inspection.

Control is part of the flow from incoming material to shipment.

01

Incoming material

Incoming material is accepted against specification and traceability needs.

Yıldırım Teknik
02

Process control

Critical operations rely on process parameters and first-article verification.

Yıldırım Teknik
03

Dimensional control

Critical drawing dimensions are verified with a suitable method.

Yıldırım Teknik
04

Final inspection

Visual, dimensional and documentation checks before shipment.

Yıldırım Teknik
05

Traceability

Lot, material and production records are linked as required.

Yıldırım Teknik
06

Documentation

Measurement reports and shipping documents are prepared on request.

Yıldırım Teknik